- construction/improvement of lachung-yumthang-zadong road (part of nh-310 a) design chainage from km 52.808 to km 81.203 (net length 28.395 km) from cl-9 to nhdl with paved shoulder specifications under project swastik in sikkim state through epc mode
- Deadline : 07 Apr 2026
- Updated : 23 Feb 2026
- Value : 265.10 Crores
sikkim
- providing and laying bituminous concrete 3.00 cm and 4.00 cm thick compacted including correction works with dbm 5.00 cm thick compacted with hot mix plant using crushed aggregates of specified grading laying with paver finisher including cleaning of road
- Deadline : 14 Mar 2026
- Updated : 18 Feb 2026
- Value : 5.01 Crore
sikkim
- providing and laying bc 4.00 cm thick compacted incl correction works with dbm 5.00 cm thick compacted hmp using crushed aggregates of specified grading laying with paver finisher incl cleaning of road surface, applying tack coat, road marking 2.5 mm
- Deadline : 12 Mar 2026
- Updated : 17 Feb 2026
- Value : 6.50 Crore
sikkim
- renovation upgradation of existing jawans kitchen/cook houses at 05 bops of 11 bn itbp situated in distt mangan, north sikkim. all camps connected by road.
- Deadline : 11 Mar 2026
- Updated : 17 Feb 2026
- Value : 73.21 Lac
sikkim
- providing and laying bituminous concrete 4.00 cm thick compacted including correction works with dbm 5.00 cm thick compacted with hot mix plant using crushed aggregates of specified grading laying with paver finisher including cleaning of road surface
- Deadline : 07 Mar 2026
- Updated : 12 Feb 2026
- Value : 6.69 Crore
sikkim
- supply and stacking of coarse sand for sand blanketing between km 25.50 to km 35.10 on dombang pimpla road and stone aggregates of various sizes and stone dust at km 9.00 on l z k road (hmp site) for dbm and bc works from km 25.50 to km 35.10 on domb
- Deadline : 04 Mar 2026
- Updated : 11 Feb 2026
- Value : 3.66 Crore
sikkim
- supply and stacking of coarse sand (dry) for sand blanketing, crushed stone aggregates of various sizes and stone dust/sand (dry) for crushed stone base (csb) layer between km 0.00 to km 7.500 on road katao-y junction-mukti spur-area temple-smuggler?çös g
- Deadline : 04 Mar 2026
- Updated : 11 Feb 2026
- Value : 7.59 Crore
sikkim
- supply and stacking of coarse sand for sand blanketing, crushed stone aggregates of various sizes and stone dust for csb layer between km 0.00 to km 8.500 on dombang pimpla road and stone aggregates of various sizes and stone dust/sand at km 9.00 on l-z-k
- Deadline : 03 Mar 2026
- Updated : 10 Feb 2026
- Value : 6.38 Crore
sikkim
- construction and maintenance of intermediate lane with paved shoulder of assangthang salghari to ccct nandugaon road from km 0.000 to km 14.793 length- 14.793 km, in the state of sikkim.
- Deadline : 23 Mar 2026
- Updated : 24 Jan 2026
- Value : See Document
sikkim
- construction and maintenance of bridge over andheri kholcha along manpur fatak to jorethang road and strengthening of existing road from design ch.0.000 to ch. 4.233 - length 4.233 km, in the state of sikkim.
- Deadline : 23 Mar 2026
- Updated : 24 Jan 2026
- Value : See Document