road Tenders
west bengal
- upgradation of road from house of rakesh dutta to dutta para durga mandir at kaitara
- Deadline : 16 Sep 2025
- Updated : 06 Sep 2025
- Value : 2.59 Lac
west bengal
- construction of drain from behind the mono bagdi house to pcc road at adrahati kultala para
- Deadline : 16 Sep 2025
- Updated : 06 Sep 2025
- Value : 2.48 Lac
gujarat
- led luminaire for road and street lights (v2) conforming / to is 10322 (part 5 / section 3), mcb - miniature circuit- breakers for a.c. operation as per is / iec 60898 (part 1)
- Deadline : 11 Sep 2025
- Updated : 06 Sep 2025
- Value : See Document
chhattisgarh
- custom bid for services - permanent dust suppression system (dss) at wharf walls 1 & 2 and along the interconnecting roads of talaipalli coal mine project
- Deadline : 12 Sep 2025
- Updated : 06 Sep 2025
- Value : See Document
rajasthan
- madar-karjoda-ctr(p)with 60 kg rail on passenger running loop line-15.953 kms in jurisdiction of aden/marwar jn,,13.56 kms in jurisdiction of aden/falna.& 9.209 kms in jurisdiction of aden/abu road, trr (p) with 60 kg rail on passenger running loop line 7
- Deadline : 09 Oct 2025
- Updated : 06 Sep 2025
- Value : See Document
orissa
- s&t work for comprehensive replacement of steel girder bridges with psc slab bridges (spans 12.20 m & 6.10 m) in sections bhc-mzz, mzz-ngmp, knpr-bbsn, ctc-prdp, kur-psa, nrg-tlhr, rjgr-brag, kis-sqq, and tlhr-sbp under khurda road division.
- Deadline : 03 Oct 2025
- Updated : 06 Sep 2025
- Value : See Document
maharashtra
- matunga road (railway colony), dadar railway colony, mahim running room and mahim rpf barrack need based repair on day to day basis by outsourcing for a period of 365 days.
- Deadline : 30 Sep 2025
- Updated : 06 Sep 2025
- Value : See Document
uttar pradesh
- jhansi division: construction of road over bridge in lieu of level crossing no. 476 at km 1351/8-9 in banda-manikpur section.
- Deadline : 30 Sep 2025
- Updated : 06 Sep 2025
- Value : See Document
uttar pradesh
- gd-andn section:-balance work for construction of approach road, shed work, and other remaining works at lc no. 157/c, 159/c, and construction of lhs by air pushing technique in lieu of lc no. 42/c & 98/c under sanctioned works of (i)construction of lhs b
- Deadline : 30 Sep 2025
- Updated : 06 Sep 2025
- Value : See Document
maharashtra
- 25 kv ac ohe modification work in connection with laying of 220 kv ehv xlpe cable of parel grant road and carnac grant road cable connecting between tata power carnac rss, parel rss and best grant road rss in mumbai division.
- Deadline : 29 Sep 2025
- Updated : 06 Sep 2025
- Value : See Document